Under development — preview build. Bookings, payments and messages are simulated; nothing here is live yet.
Installation

Highline Access Crews

London, United KingdomBillboard posting · Cherry-picker work · Banner riggingVerified
4.9174 reviews2,210 jobs completedReplies within 1 hourBooked in 5 working days typical
Works Greater London, M25 corridor

Crews that work London's roadside estate every week, carrying the traffic-management accreditation, IPAF tickets and the insurance schedule landlords ask to see. The install photo is on your booking before the van leaves the lane.

Services and from-prices

Billboard poster posting
Two-person crew, previous sheet removed and disposed of
from £320per site
Cherry-picker access
Faces above 6 m or anything over live traffic
from £390per day
Banner rigging
Indoor or facade, access tower and venue sign-off included
from £265per site

From-prices for a standard job. The quote is fixed once the provider has the spec sheet from your booking, and the figure you accept is the figure you pay.

What's included

  • Crew, transport and the standard access equipment for the face
  • Removal and disposal of the previous poster or panel
  • A dated photograph of the finished install on your booking
  • Public liability cover and a method statement for the site file

What you supply

  • Printed material delivered at least 48 hours before the fit
  • Site access details, keys or the depot contact name
  • Any landlord permit for a road, pavement or lane closure
  • The install window you agreed with the space owner

Formats accepted

  • Printed material delivered 48 hours before the fit
  • Site access notes, keys or the depot contact on the booking
  • Lane or pavement permits where the landlord requires them

Formats delivered

  • Dated JPEG install photos on the booking, same day
  • Method statement and insurance certificate as PDF
  • Waste transfer note for the removed sheet

Recent work

Billboard posting · M4 · 2025

Gantry re-post under a lane closure

Three motorway faces re-posted between 02:00 and 05:00 under an agreed lane closure, photographed and closed out before the morning peak.

Banner rigging · Westfield · 2024

Atrium banner over live escalators

A 90 m² banner rigged overnight above escalators with the centre's own steeplejack sign-off, trading floor untouched by 06:00.

4.9 · 174 reviews

4.9On schedule
4.9Site care
4.8Proof quality

The landlord asked for the accreditation paperwork and they had it over before lunch. Fit went ahead that week.

Ruth C. · Space owner, roadside

Photos were on the booking while the crew was still packing the van. Payment released the same day.

Ade O. · Campaign manager

Other installation in United Kingdom

Compare quotes — asking two providers costs nothing.

View all