Under development — preview build. Bookings, payments and messages are simulated; nothing here is live yet.
Installation

Ridgeway Rigging

Glasgow, United KingdomPoster posting · Vehicle wrap fitting · Panel repairs
4.758 reviews486 jobs completedReplies same working dayBooked in 4 working days typical
Works Central Belt, Edinburgh, Newcastle

A Central Belt fitting team built around depot nights: wraps and panels go on while fleets are parked, and every vehicle is back in service for the morning run-out. Roadside posting covers Edinburgh to Newcastle.

Services and from-prices

Poster posting
Roadside and rail-side faces, previous sheet removed
from £275per site
Vehicle wrap fitting
Overnight at the operator's depot, panels aligned per template
from £460per vehicle
Panel repairs
Lifting edges, storm damage and re-fixes on existing faces
from £190per call-out

From-prices for a standard job. The quote is fixed once the provider has the spec sheet from your booking, and the figure you accept is the figure you pay.

What's included

  • Crew, transport and the standard access equipment for the face
  • Removal and disposal of the previous poster or panel
  • A dated photograph of the finished install on your booking
  • Public liability cover and a method statement for the site file

What you supply

  • Printed material delivered at least 48 hours before the fit
  • Site access details, keys or the depot contact name
  • Any landlord permit for a road, pavement or lane closure
  • The install window you agreed with the space owner

Formats accepted

  • Printed material at the depot 24 hours before the night shift
  • The operator's vehicle allocation list for the night
  • Access notes and the depot supervisor's contact

Formats delivered

  • Per-vehicle JPEG photo sets on the booking
  • A fleet completion sheet listing every vehicle fitted
  • Method statement and insurance certificate as PDF

Recent work

Wrap fitting · Glasgow · 2025

22-bus livery over three depot nights

Full sides across 22 vehicles fitted in three consecutive nights, with every bus on its route by 06:30 each morning.

Panel repairs · Central Belt · 2024

Storm repairs across an A-road run

Eleven faces re-fixed in two days after a named storm, photographed and reported before the weekend's bookings went live.

4.7 · 58 reviews

4.7On schedule
4.7Site care
4.6Proof quality

Not one vehicle missed its morning run-out across three nights of fitting. That is the whole job, done properly.

Fraser M. · Bus operator, Glasgow

They found and fixed two lifting edges we had not reported while they were on site. Charged for one call-out.

Nadia K. · Drinks brand

Other installation in United Kingdom

Compare quotes — asking two providers costs nothing.

View all